Free Fixed Prices · 1-Day Install01908 893 235

    Confidential — For Approved Installers Only

    The SnugCore™ Ceiling System

    Installer Manual

    Version 1.0

    February 2026

    1. System Specification

    Final specification may vary depending on site conditions and structural assessment.

    2. Installation Procedure

    1

    Site Preparation & Roof Assessment

    Inspect existing roof structure for integrity. Confirm measurements against survey data. Verify access, clear workspace, and lay protective coverings.

    [Installation diagram — Step 1]
    2

    Timber Subframe Installation

    Fix precision-cut timber battens to underside of existing roof bars using specified fixings. Ensure level alignment across full span. Check squareness at all corners and junctions.

    [Installation diagram — Step 2]
    3

    Insulation Layer — Multi-layered Foil Insulation

    Install multi-layered foil insulation within the subframe cavity as part of the SnugCore™ Ceiling System build-up. Ensure continuous coverage with no gaps or compression. Overlap all joints by minimum 50mm and seal with foil tape to maintain vapour barrier continuity. Maintain correct air gap principles for optimal thermal performance.

    [Installation diagram — Step 3]
    4

    Plasterboard Ceiling Installation

    Fix plasterboard sheets to underside of subframe. Stagger joints, screw at specified centres, and tape all joints. Apply finishing compound as required by specified finish level.

    [Installation diagram — Step 4]
    5

    Lighting & Final Finish

    Cut apertures for recessed LED downlights (if specified). Wire to existing consumer unit via qualified electrician. Test all circuits. Complete final finish, clean workspace, and conduct walkthrough with homeowner.

    [Installation diagram — Step 5]

    3. Quality Checklist

    4. Brand Standards

    Naming Convention

    • • Always include ™ on first use of "The SnugCore™ Ceiling System" in any document or material.
    • • Never abbreviate to just "SnugRoof" alone in customer-facing materials. Always use the full system name.
    • • Subsequent references within the same document may use "the SnugRoof system" or "the system".

    Approved Colour Palette

    [Approved colour palette — to be specified]

    Logo Usage

    [Logo usage guidelines — to be specified]

    5. Installer Application

    Installer application process — coming soon.

    Contact info@snugroofthermal.co.uk for enquiries.